Horne Terrace

We like a challenge and the installation of high capacity duty and standby fans to a relatively limited shaft space was definitely one we were happy to take on. The system is controlled by a single NQLogiq controller with an additional UPS to allow full functionality during a mains outage.

 
Video Block
Double-click here to add a video by URL or embed code. Learn more